Egyptian Linear Alkyl Benzene (ELAB) “ELAB” had awarded Egyptian Projects Operation & Maintenance “EPROM” the project of “Construction of 12’’ Jet Pipeline 1.5 Km between ELAB & APRC Company” based on its tender No.21/2018 issued on 27/2/2018.
EPROM Company has successfully completed the project in professional manner from 30th September 2018 till 29th November 2018 ahead of schedule by one month due to the fruitful cooperation between EPROM & ELAB.
The project was executed without any delays and within budget, achieving the Project quality plan objectives and without any accident or incidents according to Highest Levels of Standards, Quality & Safety manner that met all Clients’ requirements & needs.
The scope of the work was as follows, installing 1.5 Km pipeline of diameter 12” from Amreya Petroleum Refining Company (A.P.R.C.) to ELAB along the existing ELAB pipes concrete sleepers between both companies.
The Pipeline was constructed according to ELAB Requirements and the applicable codes and standards API 1104. NDT tests were applied for welding joints and to ensure the Pipeline integrity against operation phase.
Project Team; Eng. Hisham El Deeb, Eng. Ahmed Mesbah, Eng. Ahmed Khalel, Eng. Rania Alaa,Eng. Hazem Yousy, Eng. Ayman Ezzat , Eng. Mohamed Talaat, Eng. Ahmed Abu Ouf, Eng. Alaa Shabbara.